Demolishing the old to make way for the new

Elliott supervises the first of many shipments of wood arriving on site

First frameworks go up

Replacing the border fence after Storm Ciara

New building meets old as adjoinng wall comes down

New roof construction underway

13ft.  illuminating skylight is installed

Interior showing floor construction underway

Work begins on new screed floors

Old covered cat run is taken down

New Catio awaiting planting and water feature

New catio construction started. Awaiting planting and water feature

Construction continues   Watch this space

The new ayudamist cattery in pictures

Insulation and linings being installed
Linings completed
Floors sealed with latex self levelling compound
Floor insulation being installed
Final floor finishing
Pens installed
Pens nearing completion
Uvpc Skirting Installed
Inside the new pens
Inside one of the pens
The viewing window at the end of the pens
The service area behind the pens
View across the pens from the viewing window
The adjoining Storage barn takes shape
After a bad start to 2021 with snow and heavy rains work finally resumed after the mud dried out. The storage barn now has a screed floor and roof. Doors to front and rear are fitted and cladding has begun

plasterboard goes up innew cattery building
plasterboard goes up innew cattery building
The plasterboard  is installed in the grooming room part of the cattery building.
Insulation work at the main entrance to the cattery
Grooming room insulation now laid
Self levelling compound laid in the groom room finishing the concrete floor 
Outdoor cattery runs under construction
THe new cattery runs nearing completion
Our new feature wall as you enter the cattery
New grass for the cat runs

Cattery kitchen installation started

Installation of grooming area started